How can Alliance take an obsolete PLC/5 that runs the risk of failure without a reduced downtime replacement?
This particular client owns and operates a 15 MWatt steam turbine/generator which was being controlled by an obsolete PLC/5- an outdated system that runs a high risk of failure. After being contracted to perform a turnkey control system upgrade, Alliance designed and implemented a new system control to fix this problem. Alliance installed a Rockwall ControlLogix system and updated Bentley-Nevada machine protection systems.
Alliance’s teams designed, provided, and programmed the new ControlLogix system and then conducted the FAT testing at our facility with the clients and assisted during the installation/wiring of the new system. We then performed all pre-startup checks as well as the final startup and commissioning of the CoGen system.
No matter your industry, having the right partner to ensure project success is critical. Our civil and structural engineering experts can help evaluate, plan, and execute your projects.
Competition, compliance, and regulation drive change. Improve processes, production, reduce costs and maximize your return on investment.
With demand increasing, so it's more important than ever to manage digitization and growth challenges with an experienced partner.
Facing transformation, be ready to adapt as demands for energy efficiency, environmental responsibility, reliability, and sustainability grow.
From problem-solving to integrating new projects with minimum downtime, significantly improve your return on capital investment and speed to market.
The increase in demand for steel has led to strong activity, but manufacturers must adapt to a volatile and changing market.